Wednesday, November 25, 2009

Parish/Idlewilde DMP Site Reclamation



Project Manager: Joe Humbertson
Client: Anne Arundel County, Maryland
Completion Date: January 7, 2009
Original Contract Amount: $1,685,360.18
Duration: June 2, 2008 to January 7, 2009 – 220 calendar days


Anne Arundel County, Maryland contracted Environmental Quality Resources to excavate and maintenance a DMP (Dredge Material Placement) site. The scope of the work included excavation and hauling of over 70,000 cubic yards of existing dredge material to a dump site, relining the DMP with WaterSaver Pondline to prevent contamination of the surrounding soil, and improving the drainage of the site.

Drainage of the reclaimed site is now facilitated by an 18” CPP advanced drainage system tied to the ground by earth anchors. The saturated material was hauled inland to create room for additional dredge spoils from the surrounding creeks. EQR was able to preserve and protect the surrounding shoreline wetland ecosystem.

Wednesday, November 18, 2009

Marten's Property: Reforestation Planting



Project Manager: Chris Mourlas
Client: Toll Brothers
Completion Date: July 31, 2006
Original Contract Amount: $234,761.00
Project Duration: May 24, 2006 to July 31, 2006


Toll Brothers contracted Environmental Quality Resources,LLC to reforest an area in Montgomery County. Approximately 5,300 native plants including trees, shrubs, and grasses were implemented on the site based on their hydrologic requirements. Before installation of the new plants could begin, EQR conducted an invasive species control of the area to remove all existing non-native plant material.

Factors including 100-year-flood conditions and beavers damaged the initial installation of plants and interpretive signage prompting additional costs and repairs. EQR resolved these issues and installed more plant material to increase biodiversity and today it is a well-established, forested wetland.

Wednesday, November 11, 2009

Donaldson Run Headwaters: Stream Restoration



Project Manager: Ken Williams
Client: Arlington Virginia Department of Environmental Services Utilities and Environmental Policy Division
Completion Date: February 9, 2007
Original Contract Amount: $245,810.40
Duration: December 11, 2006 to February 9, 2007 – 60 calendar days


The Department of Environmental Services, Utilities and Environmental Policy Division of Arlington, Virginia contracted Environmental Quality Resources, LLC to re-construct approximately 490 linear feet of Donaldson Run Stream. Located on private property within a steep forested stream valley with limited access, the project called for the restoration of a meandering channel and floodplain with installations of habitat and grade control structures including rock cross vanes and step-pools. Following the restoration of the stream, EQR planted a native riparian buffer along the banks as well as reforested select surrounding areas.

Wednesday, November 4, 2009

Calf Run at Sherman Ave and Woodland Ave: Stream Restoration



Project Manager: Kenneth Williams
Client: New Castle County Department of Special Services
Completion Date: March 23, 2009
Original Contract Amount: $140,307.66
Duration: November 24, 2008 to March 23, 2009 -120 calendar days


The New Castle County Department of Special Services selected
Environmental Quality Resources, LLC to stabilize a section of Calf Run between Sherman Avenue and Woodland Avenue located in New Castle County, Delaware. Restoration included the installation of a gabion wall, rock cross vanes, a rip-rap slope, and improved grading conditions along the length of the project area.